6ème Art / Îlot Lafayette (former Areva-Framatome head office)
Loading resource content...

What it cost

The works
€35 million (2023)
Floor area
8,000 m² gross

How sure: works cost, with the floor area from another source or worked out. The comparison with building new waits for a second look. Each figure was read on a page that names this project: icade.fr (gross floor area); batiactu.com (gross floor area, paid); nouveaulyon.fr (works cost). Checked 14 October 2026.