Every assumption behind the model
The buildingSee it in the model
What does it cost to convert?
- Building costs, as a share of the country’s figure100%
If you think building costs more or less than the country’s own figure, move this: 100% keeps it, 120% makes the works a fifth dearer in every city.
Our design choice Somewhat sure · we’re testing this · one of the twelve that matter most
A reader’s disagreement with the country’s own construction-cost data; 100% = that figure.
Think it’s wrong? Tell us - Works running over budget0%
How far the works cost more (or, below zero, less) than their target. An overrun: the reserve for surprises pays the first part, and the developer shares the rest. A saving: the developer earns a share of it.
Our guess Not sure yet · we’re testing this · one of the twelve that matter most
Zero in the base case; the bad-decade scenario sets 15%, of which the reserve for surprises absorbs the first part. Below zero the works come in under their target and the saving is shared with the developer (‘Developer’s share of a saving’).
Think it’s wrong? Tell us - Size of the building7,500 m²
The whole floor area of the converted building, walls, stairs and shared rooms included.
Our design choice Somewhat sure
A city office block of the kind that stands half-empty in most European cities; this is the reference building the model runs, not a market average.
Think it’s wrong? Tell us - Years of works before anyone moves in3 years
How long permits and building works take, during which money is spent and nothing comes in.
Market benchmark Somewhat sure
Typical time for an office-to-housing conversion (permits + works, ~3 years)
Think it’s wrong? Tell us - Planning and fees12%
Architects, permits, surveys and project management, as a share of the building works.
Market benchmark Somewhat sure
Usual allowance for soft costs on a conversion
Think it’s wrong? Tell us - Reserve for surprises in the works10%
An allowance for what turns up once walls are opened (hidden structure, services, asbestos), as a share of the works.
Market benchmark Somewhat sure
Usual contingency on existing-building works (higher than for new build)
Think it’s wrong? Tell us - Furnishing each mid-term flat€15,000
What it costs to fully furnish one flat for members on the move — beds, sofa, kitchen, storage, lighting.
Market benchmark Somewhat sure
Hospitality-grade fit-out for a ~60 m² serviced flat
Think it’s wrong? Tell us - Cost of building newper city
What a m² of new housing costs to build in the country, land excluded — the yardstick the conversion cost is measured against.
Sourced data Somewhat sure
Curated national construction cost (excluding land), with its source on each country
Think it’s wrong? Tell us - Converting, as a share of building newper city
What turning an office into homes costs compared with building new: 0.7× means converting costs 70% of building new, 30% cheaper. A poor candidate can cost more than 1×.
Sourced data Somewhat sure · we’re testing this
Curated per-country conversion-cost factor from conversion studies; 0.7× where a country has none
Think it’s wrong? Tell us
How is it paid for?
- Own money put in (the rest is borrowed)42%
How much of the building is paid for with members’ and investors’ own money rather than a bank loan — more own money means a smaller loan, a lower rent and a loan a bank will actually give.
Our design choice Somewhat sure · we’re testing this · one of the twelve that matter most
The range runs to 100% because the bad-decade scenario needs about 92%. The value on this card is chosen so that a bank lends on its usual terms without counting the residents’ volunteer hours; when those hours left the bank’s test (2026-09-28) the reference building in Berlin needed 42%, and at around 35% about nine otherwise-workable cities fell just short.
Think it’s wrong? Tell us - Bank loan interest rate3.8% a year
The yearly interest a bank charges on the building’s main loan — one rate for the euro area, and each country’s own rate where it borrows in another currency (Swiss francs, zloty, pounds…).
Sourced data Somewhat sure · we’re testing this · one of the twelve that matter most
ECB cost-of-borrowing indicator / national central banks (2026), 2026
Think it’s wrong? Tell us - A local co-operative investsOff
Whether an existing local housing co-operative puts money of its own into the building alongside the residents.
Our design choice Somewhat sure
Off until a real local partner is found — a young co-operative usually has nothing to invest.
Think it’s wrong? Tell us - Ground-floor tenants buy a stakeOn
Whether the businesses renting the ground floor also buy co-operative shares, in proportion to the space they use.
Our design choice Not sure yet
The businesses on the ground floor belong to the building’s co-op alongside the households, and mixed-use co-operatives often ask their commercial tenants to buy in, in proportion to the space they use. Not yet tested with any real tenant.
Think it’s wrong? Tell us - Years to repay the loans35 years
How long the building takes to pay back what it borrowed; after that, the loan payments stop.
Market benchmark Somewhat sure
Typical repayment terms for European housing loans (25–40 years)
Think it’s wrong? Tell us - Years the loan’s interest rate is fixed10 years
Banks fix the rate for a set number of years, not for the whole loan; after that the rest of the loan is re-priced at the rate of the day.
Market benchmark Somewhat sure
German and Austrian banks usually fix housing loans for 10–15 years
Think it’s wrong? Tell us - Rate change when the fixed period ends0 points
Points added to the rate when it resets after the fixed period (1 = one percentage point dearer, negative = cheaper); the rest of the loan is then repaid at the new rate.
Our design choice Somewhat sure
Zero by default: nobody knows the rate in ten years, so this is a stress lever to see whether the building survives a dearer loan, not a forecast.
Think it’s wrong? Tell us - Yield a valuer puts on the building4.5%
The yield a valuer divides the building’s yearly income by to put a value on it — it sets the loan-to-value a bank sees, not the rent (a higher yield means a lower value).
Market benchmark Somewhat sure
Residential yields for stabilised German and Dutch assets, ~4–5%
Think it’s wrong? Tell us
Cheaper money (all off in our version)
- A cheaper loan from a mission lenderOff
Whether part of the borrowing comes from a co-operative, ethical or public bank at below-market interest.
Our design choice Somewhat sure
Off in the baseline: the model must work at market borrowing costs before it counts on cheaper money.
Think it’s wrong? Tell us - Mission lender’s interest rate1.5% a year
The yearly interest on the cheaper loan, when it is switched on.
Market benchmark Not sure yet
Typical terms of co-operative, ethical and public development banks
Think it’s wrong? Tell us - A European framework loanOff
Whether part of the borrowing comes from one European facility the network negotiates for all its buildings (the kind the EIB runs).
Our design choice Not sure yet
A mature-network prospect, not something a first building can count on.
Think it’s wrong? Tell us - European framework loan rate2.7% a year
The yearly interest on the European framework loan, when it is switched on.
Our guess Not sure yet
Set below the euro-area bank rate; no such facility has been negotiated yet.
Think it’s wrong? Tell us - A co-operative or green bondOff
Whether part of the borrowing is a bond sold to members and the public, on which only interest is paid until it matures.
Our design choice Not sure yet
Off by default: it is an option we are exploring, not a plan.
Think it’s wrong? Tell us - Bond interest rate3% a year
The yearly interest the bond pays its holders, when a bond is used.
Our guess Not sure yet
Between subsidised money and a bank loan, as co-operative bonds tend to price.
Think it’s wrong? Tell us - A separate loan for the worksOff
Whether the construction is paid for by a short-term loan that the long-term loan replaces once the building is full.
Our design choice Not sure yet
Off by default: the works are financed at the long-term rate until a construction lender is lined up.
Think it’s wrong? Tell us - Works loan interest rate6% a year
The yearly interest on the separate construction loan, when it is used.
Our guess Not sure yet
Construction lending prices above long-term debt; the rate here is a cautious placeholder.
Think it’s wrong? Tell us - Works loan arrangement fee1%
A one-off fee for setting up the construction loan, as a share of the loan.
Market benchmark Not sure yet
Typical arrangement fee on development loans (~1%)
Think it’s wrong? Tell us - Grants that take the first losses on the works loan0%
The part of the construction loan funded by donations or grants that take the first losses, making the rest safer to lend. Not priced in yet: the model records the cushion’s size, but it changes no rate, fee or other number.
Our design choice Not sure yet
Zero until a foundation or public body offers such a cushion; until a lender tells us what it is worth, the model does not let it lower the loan’s price.
Think it’s wrong? Tell us - Count on public housing subsidyOff
Whether the building uses the city’s or country’s social-housing grant and cheap loan, where a verified one exists.
Our design choice Fairly sure
Off by default: the model must stand on its own economics first, and only go further where a real scheme exists.
Think it’s wrong? Tell us - Public housing grant€1,800 a m²
A grant that never has to be repaid, per m² of the long-term homes, from the local social-housing scheme.
Sourced data Somewhat sure
Verified national and city housing-subsidy schemes (2024–2026), 2026
Think it’s wrong? Tell us - Public housing loan€5,300 a m²
How much cheap public loan the social-housing scheme offers per m² of the long-term homes.
Sourced data Somewhat sure
Verified national and city housing-subsidy schemes (2024–2026), 2026
Think it’s wrong? Tell us - Public housing loan rate0% a year
The yearly interest on the public housing loan — often zero.
Sourced data Somewhat sure
Verified national and city housing-subsidy schemes (2024–2026), 2026
Think it’s wrong? Tell us - Public housing loan term30 years
How many years the public housing loan runs.
Sourced data Somewhat sure
Verified national and city housing-subsidy schemes (2024–2026), 2026
Think it’s wrong? Tell us - Rent cap that comes with the subsidy€7 a m² a month
The highest starting rent the subsidised homes may charge in return for the public money (zero means no cap).
Sourced data Somewhat sure
Verified national and city housing-subsidy schemes (2024–2026), 2026
Think it’s wrong? Tell us - Count on an office-to-housing incentiveOff
Whether the building uses a public programme that rewards turning offices into homes, where one exists.
Our design choice Fairly sure
Off by default, like all public money: the baseline assumes none.
Think it’s wrong? Tell us - Conversion grant30%
A grant covering this share of the cost of turning the offices into homes.
Sourced data Somewhat sure
Verified office-to-housing conversion incentives, e.g. KfW 266 (DE), PHB 2.0 (FR), 2026
Think it’s wrong? Tell us - Most the conversion grant pays per home€30,000
The ceiling on the conversion grant for each home created. Zero means no grant at all, not “no ceiling” (unlike the subsidy’s rent cap) — set a figure here or the grant pays nothing.
Sourced data Somewhat sure
Verified office-to-housing conversion incentives, e.g. KfW 266 (DE), PHB 2.0 (FR), 2026
Think it’s wrong? Tell us - Conversion loan€0 a m²
How much cheap public loan a conversion programme offers per m² of homes.
Sourced data Somewhat sure
Verified office-to-housing conversion incentives, e.g. KfW 266 (DE), PHB 2.0 (FR), 2026
Think it’s wrong? Tell us - Conversion loan rate0% a year
The yearly interest on the conversion loan.
Sourced data Somewhat sure
Verified office-to-housing conversion incentives, e.g. KfW 266 (DE), PHB 2.0 (FR), 2026
Think it’s wrong? Tell us - Conversion loan term0 years
How many years the conversion loan runs.
Sourced data Somewhat sure
Verified office-to-housing conversion incentives, e.g. KfW 266 (DE), PHB 2.0 (FR), 2026
Think it’s wrong? Tell us
The land
- How the building gets its landLease the land for a ground rent
Whether the co-operative leases the land for a yearly ground rent, buys the site outright, or an owner puts the building in for a stake.
Our design choice Somewhat sure · one of the twelve that matter most
A long lease keeps the land cost out of the loan and the land off the market for good; buying is the fallback where no lease is offered.
Think it’s wrong? Tell us - Yearly ground rent2.5% a year
What the co-operative pays each year to lease the land, as a share of what the land is worth.
Market benchmark Somewhat sure
A cautious middle for a co-operative deal on a city office site; a council concession would be nearer 2%. The value on this card is the site default.
Heritable building rights (Erbbaurecht): market ground rents ~3–5%, municipal and co-operative leases ~1.3–2%
Think it’s wrong? Tell us - Length of the land lease99 years
How many years the land lease runs — shown to lenders beside the loan’s term, because a bank wants the lease to outlast its loan by a wide margin.
Our design choice Somewhat sure
99 years, the usual length of a heritable building right; it is shown to lenders and checked against the loan, and does not change the rent.
Think it’s wrong? Tell us - Return to an owner who contributes the building2% a year
The yearly return an owner who puts the building in (instead of selling it) receives on the part of it that is still theirs — zero would be a gift. Once the investors are out, the building buys the owner out at what the building was worth when it was put in, so the return shrinks and the co-op ends up owning it.
Our guess Not sure yet
A mission-aligned owner accepting about a ground rent’s worth; untested with any real owner.
Think it’s wrong? Tell us - An office site’s price, as a share of housing land85%
What an empty office site is worth compared with land for new homes in the same city — below 100% means the site comes cheaper. It sets the site’s value however the land is held: the price if it is bought, the ground rent if it is leased, the owner’s stake if it is contributed.
Our guess Not sure yet
Half-empty office buildings trade below prime housing land; the results across cities lean on how far below, so this is one to test.
Think it’s wrong? Tell us - Floor space built per m² of land2×
How many m² of floor the building has for each m² of land it stands on — it turns a land price into the value of the plot, and so sets the price, the ground rent or the owner’s stake, whichever way the land is held.
Market benchmark Somewhat sure
Typical density of an inner-city office block
Think it’s wrong? Tell us - Costs of buying the site7%
Transfer tax, notary, registration and checks, as a share of the price, when the site is bought.
Market benchmark Somewhat sure
Property purchase costs across European countries (~4–8%)
Think it’s wrong? Tell us - Land priceper city
What a m² of land for housing costs in the city — it sets the ground rent, or the price if the site is bought.
Sourced data Somewhat sure
Curated city data: residential land prices, shown with its source on each city
Think it’s wrong? Tell us - Land prices, as a share of the city’s figure100%
If you think the city’s land prices are too high or too low, move this: 100% keeps the city’s own figure, 120% makes land a fifth dearer in every city.
Our design choice Somewhat sure
A reader’s disagreement with the city’s own data; 100% = the city’s figure.
Think it’s wrong? Tell us
What the furnished flats and ground floor earn
- How full the mid-term flats are96%
The share of the year the furnished flats are lived in.
Our guess Not sure yet · we’re testing this · one of the twelve that matter most
A growing member network should keep them full, but no building has run yet — a fixed input we are testing with partners and pilots.
Think it’s wrong? Tell us - Furnished flats priced at this share of the market85%
What members on the move pay for a furnished flat, as a share of the six-month furnished market (scaled for the flat’s size) — every year: the flats’ price follows that market (‘Yearly rise in market rents’).
Our design choice Somewhat sure · we’re testing this · one of the twelve that matter most
Set below the market so the flats stay attractive for their flexibility and community, yet high enough that they help carry the long-term homes; it is not a deep discount. One of the numbers we are testing.
Think it’s wrong? Tell us - Rent that goes unpaid1.5%
The share of rent from occupied homes that is paid late or never, apart from empty homes.
Market benchmark Somewhat sure
Typical arrears for well-run rented housing (~1–2%)
Think it’s wrong? Tell us - Market rent for a furnished flat, rented for six monthsper city
What a whole furnished flat costs per m² when you rent it for about six months on the platforms people use (HousingAnywhere, Wunderflats, Spotahome…), bills included — the price the mid-term flats compete with. It is quoted for a flat of about 45 m²; a bigger flat rents for less per m², so the model scales it down for the size of our furnished flats (by roughly 8–12% for a flat of 60–70 m²) before pricing them.
Sourced data Not sure yet
Measured for the focus cities; elsewhere it is estimated from the city’s ordinary rent, using the ratio the focus cities show. The size step is gentle (the 45 m² basis already leaves out pure studios) and never raises the price; the city’s own figure is what the city pages show.
Curated city data: mid-stay furnished rents, shown with its source on each city
Think it’s wrong? Tell us - Market rent for a furnished leaseper city
What a furnished flat on a year-long lease costs per m² — not what a member staying a few months could get, so it is not the comparison. Used, raised by 40%, to estimate the six-month rent only where a city has no ordinary rent either.
Sourced data Not sure yet
The 1.4× step is the median across the 36 focus cities whose six-month rent was measured; it is an estimate wherever it is used.
Curated city data: furnished rents, shown with its source on each city
Think it’s wrong? Tell us - Market rent for the ground floor€18.94 a m² a month
What a neighbourhood shop or café space rents for per m² each month, worked out from the city’s housing rent.
Market benchmark Not sure yet
No Europe-wide source for neighbourhood shop rents exists; broker data covers prime high streets only.
1.2× the new-lease housing rent (higher in cheap cities), checked against secondary ground-floor rents in Amsterdam, Berlin, Vienna, Madrid and Paris/Lyon
Think it’s wrong? Tell us - A ground floor let to a businessOn
Whether the building has a ground floor let to a café, workshop or shop.
Our design choice Fairly sure
Office buildings come with street-level space that earns more as a business let than as homes.
Think it’s wrong? Tell us - Ground-floor rent vs market95%
What the ground-floor business pays, as a share of the market rent for such a space — every year: its rent follows that market (‘Yearly rise in market rents’).
Our design choice Somewhat sure · we’re testing this
Let a little under market to keep a mission-aligned business in place.
Think it’s wrong? Tell us - How full the ground floor is96%
The share of the year the ground-floor space is let.
Our guess Not sure yet · we’re testing this
Stands in for how many member companies take space; untested until a floor is let.
Think it’s wrong? Tell us - How the ground floor is runLet, plus events from the member network
Whether the ground floor is simply let, or also receives events and bookings from the member network for a commission to the organisation.
Our design choice Somewhat sure
The event channel is an upside we have not tested; the value on this card is the site default.
Think it’s wrong? Tell us - How full the long-term homes are99%
The share of the year the long-term homes are lived in.
Market benchmark Fairly sure
Vacancy in affordable co-operative and social housing (near-full)
Think it’s wrong? Tell us
Running costs
- Heating, water and other utilitiesper city
What utilities cost per m² each month in the city — added to the rent to show a household’s full monthly cost, and paid by the building for the furnished flats, whose price includes bills, so dearer utilities leave those flats less to spare.
Sourced data Somewhat sure
Curated city data: utility costs, shown with its source on each city
Think it’s wrong? Tell us - Running costs, as a share of our figures100%
If you think repairs, tax, insurance, cleaning and the shared rooms cost more or less than the cards below, move this: 100% keeps them, 120% makes them all a fifth dearer (the savings for big repairs and the city’s utilities stay as they are).
Our design choice Somewhat sure
A reader’s disagreement with the running-cost figures in one move; 100% = the figures as they stand.
Think it’s wrong? Tell us - Day-to-day repairs€0.5 a m² a month
Routine maintenance and small repairs, per m² each month.
Market benchmark Somewhat sure
Typical running repairs for a well-kept multi-family building
Think it’s wrong? Tell us - Savings for big repairs0.8% a year
Money put aside each year for the roof, façade, heating and lifts, as a share of what the works cost.
Market benchmark Somewhat sure
Renewal-fund practice in established housing co-operatives (~0.8%/yr)
Think it’s wrong? Tell us - Property tax€1.55 a m² a year
Local property tax per m² each year.
Market benchmark Not sure yet
A European middle value — it varies widely by country
Think it’s wrong? Tell us - Building insurance€1.8 a m² a year
Insuring the building, per m² each year.
Market benchmark Somewhat sure
Typical buildings insurance for multi-family housing
Think it’s wrong? Tell us - Keeping the furnished flats furnished€1 a m² a month
Replacing and repairing furniture and equipment in the mid-term flats, per m² each month.
Our guess Not sure yet
Longer stays wear furniture less than a hotel; untested until a building runs.
Think it’s wrong? Tell us - Cleaning the mid-term flats€0.6 a m² a month
A professional clean about once a month in the flats for members on the move, per m² each month.
Our guess Not sure yet
Members stay months, not nights, and keep the flats tidy themselves, so there is no hotel-style turnover.
Think it’s wrong? Tell us
Rents, fees and costs over time
- Yearly rise in residents’ fee1.5% a year
How much the residents’ monthly fee is allowed to rise each year — slower than market rents, and never below what the building costs to run. It sets the homes’ fee only: the furnished flats and the ground floor follow their own market (‘Yearly rise in market rents’). It matters mainly in the first years: once the solidarity cap (‘Solidarity part: at most this share of what the homes cost’) binds — in years 7 to 9 in every city — the fee follows the building’s costs plus at most the cap, and this escalator no longer moves it.
Our design choice Somewhat sure · we’re testing this · one of the twelve that matter most
A steady rise set below market growth, so the gap opens over time. Where it runs above the building’s cost the difference is declared as a solidarity contribution to the network, and the fee is never set below cost. From the year the solidarity cap binds (years 7–9 in every city) the fee tracks cost plus at most the cap, so this number only matters before then — or if no cap applied.
Think it’s wrong? Tell us - Yearly rise in market rents3% a year
How fast rents in the city rise each year. Faster growth widens the gap between the residents’ fee (whose yearly rise is set on ‘Yearly rise in residents’ fee’, and which after the first years follows the building’s costs) and the market, and it raises what the furnished flats and the ground floor earn, since they are priced as a share of their market every year — and with it EHC’s platform fee.
Our design choice Not sure yet · we’re testing this · one of the twelve that matter most
A planning assumption, not a sourced per-city figure; the stress scenario cuts it to 1%.
Think it’s wrong? Tell us - Yearly rise in running costs1.5% a year
How fast the building’s running costs rise each year.
Our guess Not sure yet
Set a little under the ECB’s 2% inflation target because part of the cost base is fixed; untested over a long horizon.
Think it’s wrong? Tell us - Market rent on a new leaseper city
What a new tenant pays per m² each month in the city today — the rent our homes are compared with.
Sourced data Somewhat sure
Curated city data: rents on new contracts, shown with its source on each city
Think it’s wrong? Tell us - Market rent across all leasesper city
The average rent across every current lease, older ones included — used where no new-lease figure exists, and to show what a long-standing tenant pays.
Sourced data Somewhat sure
Curated city data: average rents across the stock, shown with its source on each city
Think it’s wrong? Tell us - Market rents, as a share of the city’s figure100%
If you think the city’s market rents are too high or too low, move this: 100% keeps the city’s own figures, 90% makes ordinary, serviced and ground-floor rents a tenth lower in every city.
Our design choice Somewhat sure
A reader’s disagreement with the city’s own data; 100% = the city’s figure.
Think it’s wrong? Tell us - After the loan is repaid: share that lowers the fee80%
Once the homes’ loan is repaid, the share of the money freed that comes off the residents’ fee; the rest goes to the network to fund the next building. It works whether or not the solidarity cap binds.
Our design choice Somewhat sure
Our choice (2026-09-29, 80% by default): most of it goes to the households who paid the loan off — the moment an owner feels when the mortgage ends — and the network keeps the rest (the Mietshäuser Syndikat’s solidarity transfer is the precedent). The residents’ share comes off the fee and the rest goes to the network whether or not the cap on the solidarity part (‘Solidarity part: at most this share of what the homes cost’) binds; that cap limits a different thing and does not change this split.
Think it’s wrong? Tell us - Solidarity part: at most this share of what the homes cost10%
The fee rises each year, but the part above what the homes cost — the solidarity part that buys the investors out and then helps build the next building — is never more than this share of that cost.
Our design choice Somewhat sure
Our choice (2026-09-29): residents carry a small, visible part of the network’s growth; most of it comes from the people who use the network — the furnished flats, the ground floors, the members’ dues. Without a cap the solidarity part grew to over half the fee after 40 years in Berlin.
Think it’s wrong? Tell us - General inflation2% a year
How fast prices in general rise — used to show what a member’s money is worth in today’s money when they leave, to size any inflation compensation on refunds, and to keep a household’s loyalty account at its real value.
Market benchmark Fairly sure
A leaving member’s stake keeps its value in today’s money (the building’s co-op adds inflation), and so does a household’s loyalty account; an EHC member share is refunded at what was paid. None of them ever carries a market gain.
ECB medium-term inflation target (2%), 2021
Think it’s wrong? Tell us - Yearly rise in prices across the network2% a year
How fast the organisation’s wages and costs — and, at the same pace, its fees and dues — rise each year.
Market benchmark Somewhat sure
ECB medium-term inflation target (2%), 2021
Think it’s wrong? Tell us
The home and the people in it
- Average size of a long-term home (the building’s mix)66 m²
The average private floor area across the building’s long-term homes, singles’ flats and family homes together. The one-person flat the page uses as its example is a separate, representative size.
Our design choice Somewhat sure
Compact on purpose: generous shared rooms make up the difference.
Think it’s wrong? Tell us - Size of a mid-term flat66 m²
The private floor area of a furnished flat for members on the move.
Our design choice Somewhat sure
The same size as a long-term home, so families and older members can use them too — not a studio.
Think it’s wrong? Tell us - Adults per home1.5 people
How many adults live in a typical home.
Market benchmark Somewhat sure
EU household size ≈ 2.3 people, big cities ≈ 1.8–2.0 (Eurostat)
Think it’s wrong? Tell us - Children per long-term home0.7 people
How many children live in a typical long-term home.
Market benchmark Somewhat sure
EU household size ≈ 2.3 people, big cities ≈ 1.8–2.0 (Eurostat)
Think it’s wrong? Tell us - Children per mid-term flat0.7 people
How many children live in a typical furnished flat.
Our guess Not sure yet
Set equal to the long-term homes because the flats deliberately welcome families.
Think it’s wrong? Tell us - Living space per person in the cityper city
How much space the average person in the city has at home — the yardstick our compact homes are compared with.
Sourced data Somewhat sure
Curated city data: average living space per person, shown with its source on each city
Think it’s wrong? Tell us - Hours residents put in each month2 hours
How many hours each adult resident gives each month to light upkeep, admin and community work, which lowers what has to be paid for. The saving is capped at 85% of the day-to-day repairs line (a paid professional still oversees the work), so at the standard value of an hour it stops lowering the fee at about one hour a month; more hours change no number.
Our design choice Not sure yet
Everyone contributes and everyone benefits; two hours a month is modest, and it never counts towards the bank’s test. Hours beyond the cap are community life, not a further saving in the model.
Think it’s wrong? Tell us - What a volunteer hour saves€18 an hour
The paid work one hour of residents’ help replaces, in euros. The total saving is capped at 85% of the day-to-day repairs line, so once hours × value reach that cap a higher value changes nothing.
Our guess Not sure yet
Valued well below a tradesperson’s rate, since it is untrained community work.
Think it’s wrong? Tell us - Neighbours help with the stakeOff
Whether better-off households pay a little more for their stake so that households on lower incomes can pay less.
Our design choice Somewhat sure
Off by default (everyone pays the same) until a building’s members choose it.
Think it’s wrong? Tell us - Households paying more30%
The share of households who pay extra for their stake, when the solidarity pool is on.
Our guess Not sure yet
Roughly the better-off third of a mixed building; for each building’s members to decide.
Think it’s wrong? Tell us - How much more they pay25%
The extra each contributing household pays, as a share of the normal stake.
Our design choice Not sure yet
A quarter more is a noticeable but bearable contribution; for each building’s members to decide.
Think it’s wrong? Tell us - Households helped30%
The share of households whose stake the pool reduces.
Our guess Not sure yet
Roughly the lower-income third of a mixed building; for each building’s members to decide.
Think it’s wrong? Tell us - Typical income per personper city
The middle income in the country after tax, per person (adjusted for household size, so it is what one person living alone has) — used to show what share of that income the rent on a one-person flat takes.
Sourced data Fairly sure
Eurostat EU-SILC median equivalised net income
Think it’s wrong? Tell us
Buying the same flat instead
- Price of a flatper city
What buying a flat costs in the city, per m²: the midpoint of the asking prices in the centre and outside it. Used only to compare with buying.
Sourced data Somewhat sure
The model uses the midpoint of the asking prices in the centre and outside it; where a city has only one of the two it uses that one, and where it has neither, a national estimate.
Numbeo, apartment prices per m², city centre and outside (2026), shown on each city
Think it’s wrong? Tell us - Buying: deposit20%
The share of the price a buyer pays from their own savings; the rest is the mortgage.
Our guess Somewhat sure
Most European banks lend up to about 80% of the price to a first-time buyer.
Think it’s wrong? Tell us - Buying: purchase costs8%
Transfer tax, notary, land registry and agent, as a share of the price — paid on top of the deposit.
Our guess Not sure yet
Between about 3% and 15% across Europe; 8% is typical of Germany, France and Spain.
Think it’s wrong? Tell us - Buying: mortgage rate3.8% a year
The fixed interest rate on a buyer’s mortgage.
Our guess Somewhat sure
Set at the building’s own bank rate; a household usually pays a little more, so lift it to test a dearer mortgage.
Think it’s wrong? Tell us - Buying: years to repay the mortgage30 years
How many years the buyer takes to repay the mortgage.
Our guess Somewhat sure
Thirty years is the common term for a first home.
Think it’s wrong? Tell us - Buying: an owner’s yearly costs1.5% a year
What owning costs each year besides the mortgage — repairs, the building’s shared charges, insurance and property tax — as a share of the flat’s value. Heating and utilities are left out, as they are in the fee and the rent.
Our guess Not sure yet
Around 1–2% of the value a year is the usual rule of thumb for a flat.
Think it’s wrong? Tell us - Buying: yearly rise in flat prices3% a year
How fast the flat’s value rises each year. It decides most of what an owner has after thirty years.
Our guess Not sure yet
It moves with market rents in every weather: 3.5% a year in a good decade, 1% in a bad one, and the same rate as market rents in our version. Prices have risen faster than rents in many cities since 2010, and fallen in some after 2022 — this is the number to test.
Think it’s wrong? Tell us - Buying: costs of selling3%
Agent and notary when the flat is sold, as a share of its value.
Our guess Not sure yet
Around 3% where the seller pays an agent.
Think it’s wrong? Tell us
Rules we don’t bend
- Residents buy a stake in their buildingOn
Whether the people who move in put some of their own money into the building, as co-owners rather than tenants.
Our design choice Fairly sure · a rule we don’t bend
Residents owning their building together is the co-operative principle the whole model rests on.
Think it’s wrong? Tell us - Spare rent a bank insists on (1.25× = 25% to spare)1.25×
Would a bank lend? Only if the building’s spare income covers each year’s loan payments this many times over.
Market benchmark Fairly sure · a rule we don’t bend
Volunteer hours are left out of the income the bank tests: a bank does not lend against unpaid work.
Standard senior lending floor for rented housing and commercial property (1.25–1.35×)
Think it’s wrong? Tell us - Largest loan a bank will give (loan-to-cost)80%
The most a bank will lend as a share of the building’s whole cost, interest during the works included.
Market benchmark Somewhat sure · a rule we don’t bend
Typical development-lender loan-to-cost ceiling
Think it’s wrong? Tell us
Model internals
- Share of the loan already out, on average, during the works55%
How much of the construction loan is, on average, borrowed while the works run — it sets the interest paid before anyone moves in.
Market benchmark Somewhat sure
Usual approximation for a loan drawn down evenly over a build
Think it’s wrong? Tell us - Local banks offer 25–35-year loans (if not, EHC borrows centrally)On
Whether banks in the city will give a long-term loan at all; where they will not, the building borrows from a central European facility instead.
Our guess Somewhat sure
Assumed true across our focus cities; some markets in South-East Europe may need the central facility.
Think it’s wrong? Tell us - Central facility interest rate3.5% a year
The yearly interest on the central European loan used where local banks will not lend long-term.
Our guess Not sure yet
A pooled European rate a little below the euro-area bank rate; no such facility exists yet.
Think it’s wrong? Tell us - Central facility repayment term25 years
How many years the central European loan runs, where it is used.
Our guess Not sure yet
Shorter than a local mortgage, as central facilities tend to be; a placeholder.
Think it’s wrong? Tell us - Banks lend less on leased land in some countriesOn
Whether the model asks for more own money where a land lease is weaker security for a bank.
Our design choice Somewhat sure
Where land leases are rarely used for housing, lenders want a bigger cushion; ignoring that would flatter those countries.
Leasehold viability research across 30 countries, 2026
Think it’s wrong? Tell us - Extra own money, middling lease countries+10 points
How many extra percentage points of own money a building needs in a country where land leases work but are thin for housing.
Our guess Not sure yet
Which countries fall in each tier is researched; the size of the extra cushion is our judgement.
Leasehold viability research across 30 countries, 2026
Think it’s wrong? Tell us - Extra own money, weak lease countries+20 points
How many extra percentage points of own money a building needs where land leases are short, hard to borrow against or barely used for housing.
Our guess Not sure yet
Which countries fall in each tier is researched; the size of the extra cushion is our judgement.
Leasehold viability research across 30 countries, 2026
Think it’s wrong? Tell us - Floor lost to stairs and corridors1.25×
How many m² are built for each m² people can use: 1.25× means 1.25 m² built for each m² you can use, so about 80% is usable and the rest is stairs, corridors and walls.
Market benchmark Somewhat sure
BDA Bayern, Office to Housing (2025): living area about 80% of gross floor area in converted offices (75% when subsidised); TU Delft, Adaptive Reuse for Housing (2025): office lettable area loses 10–20% as homes
Think it’s wrong? Tell us - Check: how far below market the furnished flats should be7%
A target the model checks, not a price: the members’ row for the furnished flats passes only if their price (set on ‘Furnished flats priced at this share of the market’) is at least this far below the market.
Our design choice Somewhat sure
A check on the price card, not a second price: just below market is enough, because the flats’ value is flexibility and community, not a deep discount.
Think it’s wrong? Tell us - Members in the city215 people
How many members live in or want to come to the city — shown beside the furnished flats as a check on demand.
Our guess Not sure yet
A placeholder until the appetite test gives real numbers per city.
Think it’s wrong? Tell us - Members who take a stay elsewhere50%
The share of members who, at some point, move to another city for a few months.
Our guess Not sure yet
Half is our guess for a network that attracts people who move for work; untested.
Think it’s wrong? Tell us - How often a mobile member moves3 years
A member on the move takes a stay once every this many years.
Our guess Not sure yet
Once every three years is our guess for members who move for work; untested.
Think it’s wrong? Tell us - Length of a mid-term stay6 months
How long a typical stay in a furnished flat lasts.
Our guess Not sure yet
About six months, the middle of the three-to-twelve-month range the flats are designed for.
Think it’s wrong? Tell us - Least private space per person22 m²
Below this much private space per person the model warns that homes are becoming overcrowded.
Our design choice Somewhat sure
A guard-rail, not a cost: compact is fine, cramped is not.
Think it’s wrong? Tell us - Check: how far below market the homes should start7%
A test, not a price: the residents’ row passes if the homes start at least this far below a new lease in the city, OR if the fee grows more slowly than market rents so the gap opens over time. The fee itself is always the building’s cost, so in year one it can sit close to the market.
Our design choice Somewhat sure
The homes charge what they cost, not a discount, so being level with the market in year one is allowed; what the test insists on is that residents get ahead of the market over time.
Think it’s wrong? Tell us
The organisationSee it in the model
The investors’ deal
- Return to the Fund’s investors3.5% a year
The yearly return paid on the money the Fund puts into a building — it is part of what the rent has to cover, so a lower return keeps the homes cheaper.
Our design choice Somewhat sure · we’re testing this · one of the twelve that matter most
3.5% is enough to interest a broad range of impact investors, individuals included, while keeping the rent low.
Think it’s wrong? Tell us - Most investors may earn4% a year
The ceiling on the yearly return on all the investors’ money in a building — the part in the homes and the part in the furnished flats and ground floor alike. Anything a building earns above it stays with the building and the network, never with investors.
Our design choice Fairly sure
A capped return is what keeps the model non-speculative.
Think it’s wrong? Tell us - Years before investors can be bought out5 years
How long investors’ money stays in the building before the building’s co-op starts buying them out.
Our design choice Somewhat sure
Five years protects the building, and its bank, through the risky first years after opening.
Think it’s wrong? Tell us - Years over which EHC buys its lasting share10 years
After the lock-up, how many years EHC takes to buy — with its own money, in equal yearly slices — the part of the investors’ stake that becomes its lasting share (‘EHC’s lasting share of each building’). It does not pace the rest: the building’s co-op buys the other investors out as fast as the building’s surplus allows.
Our design choice Somewhat sure
Ten years spreads EHC’s own purchase so it never strains EHC’s cash. When the investors are fully out depends on the building’s surplus, not on this card.
Think it’s wrong? Tell us
Who is paid for the work
- Developer’s margin4%
What the local partner that leads the design, permits and works earns, as a share of the works plus the planning fees and the reserve for surprises — a one-off, paid from the building’s budget.
Our design choice Somewhat sure
A modest margin on a target-cost contract; the developer is paid, it takes no stake in the building.
Think it’s wrong? Tell us - Who runs the buildingA professional manager, for a fee
Whether a professional housing manager runs the building for a fee, or the building’s co-op runs it itself.
Our design choice Somewhat sure
A new building’s co-op is not assumed to run a whole building alone from day one.
Think it’s wrong? Tell us - Building manager’s fee7%
What the building manager is paid, as a share of the rent collected, for running the building.
Market benchmark Somewhat sure
Kept low because the platform and residents’ help carry part of the work.
European management-fee band (~6–12% of collected rent)
Think it’s wrong? Tell us - Manager’s own costs, share of its fee80%
How much of the manager’s fee goes on the manager’s own staff and costs; the rest is its margin.
Our guess Not sure yet
A guess until an operator shares its numbers.
Think it’s wrong? Tell us - A different firm runs the buildingOff
Whether the building is run by a different organisation from the one that developed it.
Our design choice Somewhat sure
By default one local partner builds and then runs it. It changes who the money-flow map names, not the numbers: the pay is the margin and fee cards.
Think it’s wrong? Tell us - What the founders draw in the founding years60%
The share of a normal salary the founders take while EHC is being built. The rest is owed to them as deferred pay.
Our design choice Somewhat sure
The founders carry the risk that EHC never works. Taking less pay early leaves the money in EHC when it is scarcest; what they give up is owed to them and repaid only out of surplus.
Think it’s wrong? Tell us - The most the founders can be repaid3×
The most the founders can ever receive for their deferred pay, as a multiple of what they gave up.
Our design choice Not sure yet
A cap keeps the reward proportionate however long the wait. At 3× and our other defaults, about €0.8 million given up in the founding years is repaid as about €2.4 million, most of it in the fifteen years after that.
Think it’s wrong? Tell us
EHC’s income
- EHC’s fee from each building6%
What each building pays EHC, as a share of what its furnished flats and ground floor earn, for the platform and the members it brings.
Our design choice Somewhat sure
6% funds the central organisation while leaving the building enough for investors and a reserve.
Think it’s wrong? Tell us - EHC’s one-off fee for starting a building2%
A one-off fee EHC earns for finding the building, putting the money together and bringing the project to life, as a share of its cost.
Our design choice Not sure yet
How EHC could earn without holding stakes; a judgement, not a market rate. Set it to zero to see the network without it.
Think it’s wrong? Tell us - Booking fee on a mid-term stay3%
A small fee, on top of the rent, that a member pays EHC when booking a furnished flat — it funds the platform, not the building.
Our design choice Not sure yet
Small enough that a member’s all-in price (the rent plus this fee) stays clearly below a comparable furnished flat on the open market.
Think it’s wrong? Tell us - Yearly membership fee€150 a year
What each individual member pays EHC every year.
Our design choice Not sure yet · we’re testing this
Low enough to join for the values and the network, not only for a home.
Think it’s wrong? Tell us - Yearly fee: fewer than 10 staff€500 a year
What a member company with fewer than 10 staff pays EHC each year.
Our guess Not sure yet · we’re testing this
Scaled to company size so a small firm can afford to join; a placeholder until companies tell us what they would pay.
Think it’s wrong? Tell us - Yearly fee: 10–49 staff€2,000 a year
What a member company with 10 to 49 staff pays EHC each year.
Our guess Not sure yet · we’re testing this
Scaled to company size so a small firm can afford to join; a placeholder until companies tell us what they would pay.
Think it’s wrong? Tell us - Yearly fee: 50–249 staff€5,000 a year
What a member company with 50 to 249 staff pays EHC each year.
Our guess Not sure yet · we’re testing this
Scaled to company size so a small firm can afford to join; a placeholder until companies tell us what they would pay.
Think it’s wrong? Tell us - Yearly fee: 250–9,999 staff€15,000 a year
What a member company with 250 to 9,999 staff pays EHC each year.
Our guess Not sure yet · we’re testing this
Scaled to company size so a small firm can afford to join; a placeholder until companies tell us what they would pay.
Think it’s wrong? Tell us - Yearly fee: 10,000+ staff€50,000 a year
What a member company with 10,000 or more staff pays EHC each year.
Our guess Not sure yet · we’re testing this
Scaled to company size so a small firm can afford to join; a placeholder until companies tell us what they would pay.
Think it’s wrong? Tell us - Share of companies: fewer than 10 staff30%
Of all member companies, the share with fewer than 10 staff.
Our guess Not sure yet · we’re testing this
Weighted toward the employers who actually move staff between cities, not Europe’s company count (most firms are tiny); a placeholder until the appetite test. The five shares must add up to 100% (the controls keep them there).
Think it’s wrong? Tell us - Share of companies: 10–49 staff30%
Of all member companies, the share with 10 to 49 staff.
Our guess Not sure yet · we’re testing this
Weighted toward the employers who actually move staff between cities, not Europe’s company count (most firms are tiny); a placeholder until the appetite test. The five shares must add up to 100% (the controls keep them there).
Think it’s wrong? Tell us - Share of companies: 50–249 staff22%
Of all member companies, the share with 50 to 249 staff.
Our guess Not sure yet · we’re testing this
Weighted toward the employers who actually move staff between cities, not Europe’s company count (most firms are tiny); a placeholder until the appetite test. The five shares must add up to 100% (the controls keep them there).
Think it’s wrong? Tell us - Share of companies: 250–9,999 staff15%
Of all member companies, the share with 250 to 9,999 staff.
Our guess Not sure yet · we’re testing this
Weighted toward the employers who actually move staff between cities, not Europe’s company count (most firms are tiny); a placeholder until the appetite test. The five shares must add up to 100% (the controls keep them there).
Think it’s wrong? Tell us - Share of companies: 10,000+ staff3%
Of all member companies, the share with 10,000 or more staff.
Our guess Not sure yet · we’re testing this
Weighted toward the employers who actually move staff between cities, not Europe’s company count (most firms are tiny); a placeholder until the appetite test. The five shares must add up to 100% (the controls keep them there).
Think it’s wrong? Tell us
EHC’s costs
- Founding money raised at the start€2,000,000
Money EHC raises before its first building — grants, a founding round — to carry its costs through the years before the buildings’ fees and members’ dues cover them.
Our design choice Not sure yet
Zero in our version. EHC runs at a loss for its first decade or so; the members’ shares carry it because they stay in the bank until EHC covers its costs (the first-stake guarantee is off). Founding money would let EHC take its stakes in the first buildings sooner — or carry it if the guarantee is switched on (the “What EHC has in the bank” panel shows how much).
Think it’s wrong? Tell us - Platform running costs, as a share of the platform’s income12%
Hosting, data and payment costs of the platform, as a share of what it earns.
Our guess Not sure yet
Hosting, data and payment fees of a booking platform; a guess.
Think it’s wrong? Tell us - Yearly cost of one employee€75,000 a year
What one full-time employee costs in a year — salary, employer’s taxes and workplace — averaged across Europe.
Market benchmark Somewhat sure
Blended fully-loaded cost of professional staff across European countries
Think it’s wrong? Tell us - Office, travel and other costs, as a share of payroll25%
Offices, IT, travel and insurance, as a share of what the staff would cost at full pay. Audits and filings per country, the Fund’s running costs and automation tools are their own cards.
Market benchmark Somewhat sure
Standard overhead build-up for a professional-services organisation
Think it’s wrong? Tell us - Advertising and campaigns, as a share of income1.5%
Money spent on advertising and campaigns, as a share of EHC’s income.
Our guess Not sure yet
A small advertising budget, since most members arrive through the network; a guess.
Think it’s wrong? Tell us - Events and community fund per member€30 a year
What EHC spends on events, knowledge exchange and a solidarity fund for each member each year, once it can afford it (see ‘Pay the community fund only from surplus’).
Our guess Not sure yet
What EHC spends per member each year on events, exchange and a solidarity fund; a guess.
Think it’s wrong? Tell us - Yearly rise in real pay0.75% a year
How much faster than prices the pay of EHC’s staff rises each year. The work left to people — negotiating, building trust, members’ democracy — gets dearer as the economy grows.
Our guess Somewhat sure
Real pay in Europe has grown by well under 1% a year on average this century; 0.75% is our central guess over sixty years. It is paired with ‘Pace of automation’: one makes each hour dearer, the other needs fewer of them.
Think it’s wrong? Tell us - Pace of automation4% a year
Each year, software and AI take over this share of the routine work still left in each team. Each team has its own ceiling: most member support is routine, most deal-making and leadership is not.
Our guess Not sure yet
Nobody can say what AI will do over sixty years, so the model shows the team at half and at 1.75× this pace as a range. At 4% a year about a third of the routine work is automated after ten years and half after seventeen. It arrives with time, whatever EHC’s size; ‘How much more a mature team gets done’ is the separate gain from doing the same work many times.
Think it’s wrong? Tell us - What automation costs, as a share of the pay it saves25%
Automation is not free: part of the pay it saves comes back as software licences and computing.
Our guess Not sure yet
A quarter is our guess; it keeps the saving honest rather than counting it in full.
Think it’s wrong? Tell us - Pay the community fund only from surplusOn
Whether the events and community fund is paid only out of last year’s surplus (after the founders), rather than every year whatever the result.
Our design choice Fairly sure
It is money handed to members, so it waits until EHC can afford it. Paid every year, it would cost about as much as EHC’s whole cash cushion in the loss-making years.
Think it’s wrong? Tell us - Setting up in a new country€100,000
One-off lawyers’, tax and bank costs of setting up EHC’s entity in each new country, with the regulatory advice. The first countries are set up one a year.
Our guess Not sure yet
A co-operative entity, tax registration, a bank and advice on housing and financial rules in a new jurisdiction; our guess.
Think it’s wrong? Tell us - Yearly audit and filings per country€20,000 a year
Each country’s entity must be audited and file its accounts and tax returns every year.
Our guess Not sure yet
A small entity’s statutory audit, filings and registrations; our guess.
Think it’s wrong? Tell us - Deals that fall through, per building started1
For every building that goes ahead, how many were checked with paid surveys and legal work and then dropped.
Our guess Not sure yet
Many more buildings are looked at than bought; this counts only the ones that got as far as paid checks.
Think it’s wrong? Tell us - Cost of a deal that falls through€40,000
Surveys, valuation, legal checks and a feasibility study spent on a building that is then dropped.
Our guess Not sure yet
Our guess for a mid-sized office conversion.
Think it’s wrong? Tell us - Running the Fund€150,000 a year
The Fund’s administration, audit, custodian and regulatory reporting, paid by EHC as the Fund’s sponsor. While the Fund is small only a third of it applies; all of it from €100 million, where the EU’s light regime for small funds ends.
Our guess Not sure yet
A regulated fund needs an administrator, an auditor and a depositary; small funds can register under the lighter regime of the EU’s fund-manager directive (AIFMD, article 3(2)).
Think it’s wrong? Tell us
What members get back when they leave
- Loyalty accountOn
Part of the solidarity part each household pays is kept in its name and paid back when it leaves.
Our design choice Somewhat sure
Our choice (2026-09-29): years of helping the network grow are not simply gone if a member moves away. It is a member credit on what they paid, never a return on money and never a vote.
Think it’s wrong? Tell us - Loyalty account: years until it is all yours10 years
The account becomes the household’s in equal steps over this many years of membership; a household that leaves sooner takes the part it has earned.
Our design choice Somewhat sure
Ten years: it rewards staying, not a quick move in and out.
Think it’s wrong? Tell us - Loyalty account: years over which it is paid out3 years
A leaver’s account is paid out in equal parts over this many years, so no building is drained when several households leave at once.
Our design choice Somewhat sure
Three years, like a co-op’s usual notice period for paying back member shares.
Think it’s wrong? Tell us - The building’s co-op: inflation added to a leaver’s stake100%
When a household or a business downstairs leaves the building’s co-op, how much of general inflation is added to the stake it paid in. 0% = refunded at face value; 100% = it keeps its value in today’s money.
Our design choice Somewhat sure
Our choice (2026-09-28): full inflation, so a stake held for 20 years does not lose a third of its value — never more, so nobody profits from the building. The next member pays it (the next card).
Think it’s wrong? Tell us - The building pays any inflation compensationOff
Only matters when inflation is added to leavers’ stakes (the card above). On: the building pays it from what it has left over each year, before buying the investors out — a newcomer still pays the same stake, but less is left for the buy-out and for the next building. Off: the next member pays it, through an entry stake that rises with the same index — the building pays nothing, but joining gets dearer.
Our design choice Not sure yet
Our choice (2026-09-28): the next member pays, as in housing co-ops that index, so the building’s surplus still goes to the buy-out and the next building. The price is a way in that gets dearer over time, at the pace of inflation.
Think it’s wrong? Tell us - Members who leave the building each year8% a year
The share of the building’s households and businesses that move on in a year. It sets how much inflation compensation on stakes falls due each year and, when the loyalty account is on, how many accounts are paid out.
Our guess Not sure yet
The same 8% the network assumes for long-term homes coming free.
Think it’s wrong? Tell us
Rules we don’t bend
- The building’s co-op buys the investors outOn
Whether the building’s co-op buys the Fund’s investors out over time, so the building ends up owned by the people who live and trade there.
Our design choice Fairly sure · a rule we don’t bend
Ownership passing to the building’s co-op — its households and the businesses downstairs — is the point; investors are paid back, not bought in for ever.
Think it’s wrong? Tell us - The building can never be sold offOn
Whether a veto held by EHC and the residents stops any sale of the building for profit.
Our design choice Fairly sure · a rule we don’t bend
It is what makes permanent affordability a guarantee rather than a promise; it has no cost in the numbers.
Think it’s wrong? Tell us
Model internals
- Lowest return investors accept1.5% a year
The least impact investors will take each year before the money stops coming.
Our guess Not sure yet
A check on the investors’ return (‘Return to the Fund’s investors’, the lever that sets it), not a second return: what foundations and mission investors have typically accepted; to be confirmed with real investors.
Think it’s wrong? Tell us - Network stage when this building is fundedPilot: investors carry it, EHC a token share
Which stage of EHC’s life a building belongs to — early on, impact investors provide almost all of the Fund’s money; later, EHC can put in more of its own.
Our design choice Somewhat sure
Honest about the early years: EHC’s own money keeps the organisation alive before it can fund buildings. The live page opens on the pilot stage.
Think it’s wrong? Tell us - Members invest through tradeable sharesOff
Whether part of the Fund’s money comes from members and the public buying small, tradeable investment shares at a lower return.
Our design choice Not sure yet
Off while we test whether it is legally and practically workable.
Think it’s wrong? Tell us - Return on members’ tradeable shares1% a year
The yearly return members’ tradeable shares pay — lower than impact investors’, because they can be sold and the mission is the point.
Our guess Not sure yet
Separate from the investors’ return (‘Return to the Fund’s investors’). Members accept about 1% because the shares can be sold and the mission is the point; untested.
Think it’s wrong? Tell us - Members’ share capital put to work80%
How much of the money members pay for their co-operative shares goes into buildings; the rest is kept aside as a cash buffer.
Our design choice Somewhat sure
Four-fifths invested, a fifth kept liquid so leaving members can be paid back.
Think it’s wrong? Tell us - Members own a piece of the very first buildingOff
Whether members’ share capital is reserved for EHC’s stakes from the first building on, even while the organisation is not yet paying for itself.
Our design choice Somewhat sure
Off in our version (since 2026-09-30): members’ shares go into EHC’s stakes only once EHC covers its running costs and keeps its cash reserve, so its account never runs below zero; until then outside investors hold EHC’s stakes in the first buildings, and EHC buys them as its surplus allows. On, every member owns a piece of the first building — and EHC’s account runs short while it still loses money, unless it raises founding money.
Think it’s wrong? Tell us - Each building keeps the stage it started inOn
Whether a building’s mix of EHC and investor money is set by the year it started, so early buildings stay investor-funded as EHC grows.
Our design choice Somewhat sure
Off in the code default, on in the live model: it is how EHC’s own share of the whole network rises over time.
Think it’s wrong? Tell us - Scaling stage starts in year7 years
Buildings started from this year on count as the scaling stage.
Our guess Not sure yet
Set around the time the first buildings have opened and EHC’s fees start to come in; a guess.
Think it’s wrong? Tell us - Mature stage starts in year15 years
Buildings started from this year on count as the mature stage.
Our guess Not sure yet
Set for when the network has a track record and a standing book; a guess.
Think it’s wrong? Tell us - Building surplus that funds the next building100%
The share of a building’s money left after its investors are bought out that goes to the Fund, as own money for the next building; the rest stays with the building’s co-op.
Our design choice Somewhat sure
At 100% all of it revolves: each building helps start the next, so less outside money is needed as the network grows.
Think it’s wrong? Tell us - Investment shares sold each year€0 a year
Money raised each year from members and the public through tradeable investment shares, separate from membership shares.
Our design choice Not sure yet
Zero by default: impact investors fill the Fund until such a raise is tested.
Think it’s wrong? Tell us - Pool the buildings in one fundOff
Whether investors hold a share of all buildings together rather than one building each, which spreads the risk.
Our design choice Not sure yet
Off by default: one building per investment is simpler to start with.
Think it’s wrong? Tell us - First-loss slice of the pooled fund10%
The part of the pooled fund, usually from foundations or public bodies, that takes any losses first and so protects everyone else.
Our design choice Not sure yet
A tenth from foundations or public bodies is typical of blended impact funds; untested with ours.
Think it’s wrong? Tell us - Protected slice of the pooled fund70%
The part of the pooled fund that is repaid first and carries the least risk.
Our design choice Not sure yet
The protected slice most blended impact funds offer institutional money; untested with ours.
Think it’s wrong? Tell us - Chance a building fails in a year4% a year
How likely it is, each year, that a building loses some of its investors’ money. Only matters when the pooled fund (‘Pool the buildings in one fund’) or the network-wide loan (‘A network-wide loan against the Fund’s stakes’) is switched on — both read it.
Our guess Not sure yet
A cautious placeholder; co-operative housing has a strong record, but a new network has none.
Think it’s wrong? Tell us - How much failures cluster (0 = never together, 1 = all at once)0.2
How much one building’s trouble goes with another’s (0 = independent, 1 = all at once) — lower means spreading across cities protects more. Only matters when the pooled fund (‘Pool the buildings in one fund’) or the network-wide loan (‘A network-wide loan against the Fund’s stakes’) is switched on — both read it.
Our guess Not sure yet
Buildings in different cities and countries should fail mostly independently; 0.2 allows for a shared downturn.
Think it’s wrong? Tell us - A network-wide loan against the Fund’s stakesOff
Whether the Fund borrows once, against all its building stakes together, to lend more cheaply than any single building could.
Our design choice Not sure yet
Off by default: EHC takes on no debt until it has a standing book to borrow against.
Think it’s wrong? Tell us - Size of the network-wide loan3×
How many times the Fund’s lasting stakes it can borrow against.
Our guess Not sure yet
Three times the stakes, with the stakes as the cushion beneath; a placeholder until a lender prices it.
Think it’s wrong? Tell us - Loan rate for a single building3.8% a year
The rate a building borrowing alone would pay — the network-wide loan is priced below it because its risk is spread.
Market benchmark Somewhat sure
Only the network-wide loan reads it, as the rate it is priced below; the building’s own loan uses the bank loan rate (‘Bank loan interest rate’), which is the public lever. Keep the two equal unless you mean them to differ.
ECB cost-of-borrowing indicator / national central banks (2026), 2026
Think it’s wrong? Tell us - Fee EHC charges the Fund0% a year
A yearly fee EHC charges the Fund for managing its buildings, as a share of what the Fund holds.
Our design choice Not sure yet
Zero by default; it only moves money between EHC and the Fund.
Think it’s wrong? Tell us - Fund payout to investors (override)0% a year
A yearly payout from the Fund to its outside investors, as a share of their money, to show the flow between the two.
Our design choice Not sure yet
Display only — it draws the Fund-to-investor flow and does not change any building’s numbers. Zero means it follows the investors’ return (‘Return to the Fund’s investors’), which is the public lever.
Think it’s wrong? Tell us - Least fee EHC needs from a building3%
The fee below which the model says a building does not cover its share of EHC’s costs.
Our design choice Somewhat sure
A check, not a price: the level at which a building’s fee is thin enough that EHC’s central costs would not be covered across the network. A judgement; the fee itself is the card above.
Think it’s wrong? Tell us - Who takes less when money is shortEHC’s fee gives way; any surplus builds a reserve
When a building earns less than planned, whose share gives way — the residents always pay the full cost of their homes either way.
Our design choice Somewhat sure
EHC is the mission-driven party, so its fee flexes first and only the investors’ return is a hard claim.
Think it’s wrong? Tell us - EHC’s commission on ground-floor events€0 a m² a month
What EHC earns per m² each month by sending member and company events to the ground-floor business.
Our guess Not sure yet
Zero until the event channel is tested.
Think it’s wrong? Tell us - Months of running costs EHC keeps in cash15 months
How many months of its own running costs EHC holds in cash before putting its members’ shares or its surplus into buildings. (With the first-stake guarantee on, members’ shares set aside for buildings go in whatever the reserve.)
Our design choice Somewhat sure
Fifteen months of runway first: an organisation that runs out of cash helps no building. With the first-stake guarantee off (our version) the reserve comes before any stake; with it on, it holds back EHC’s surplus only.
Think it’s wrong? Tell us - Platform income from outside clients€0 a year
Yearly income from councils, other co-operatives or firms that use EHC’s digital platform.
Our guess Not sure yet
Zero until anyone outside the network pays for it.
Think it’s wrong? Tell us - Least fee a manager can live on4%
The fee below which the model flags that running the building is no longer a viable business for the manager.
Our design choice Not sure yet
Below about 4% of rent a professional manager could not staff a building; our judgement.
Think it’s wrong? Tell us - Later residents pay in lessOff
Whether the network’s recycled surplus lowers the stake that residents of later buildings must pay in.
Our design choice Not sure yet
Off by default: it changes both the stake and the rent, so it is switched on deliberately.
Think it’s wrong? Tell us - Lower stake: pilot buildings0%
How much smaller the residents’ stake is in a pilot building.
Our design choice Fairly sure
Zero: in the pilot years there is no surplus yet to pay for it.
Think it’s wrong? Tell us - Lower stake: scaling buildings12%
How much smaller the residents’ stake is in a building started while the network scales up. Only read when this building’s own stage (‘Network stage when this building is funded’) is set to scaling — the page opens on the pilot stage, and the network view does not apply it to its later buildings.
Our guess Not sure yet
What a few years of recycled surplus could fund; our judgement.
Think it’s wrong? Tell us - Lower stake: mature network25%
How much smaller the residents’ stake is in a building started once the network is mature. Only read when this building’s own stage (‘Network stage when this building is funded’) is set to mature — the page opens on the pilot stage, and the network view does not apply it to its later buildings.
Our guess Not sure yet
What a mature network’s recycled surplus could fund; our judgement.
Think it’s wrong? Tell us
GrowthSee it in the model
How fast it grows
- New cities each year1.5
The average pace at which the network opens new cities after the first pilots — few early, more later. It sets how many cities are reached by the end (this pace × the years, up to the most-cities ceiling); the openings follow a curve that starts slow and speeds up, so after ten years far fewer cities are open than ten times this number.
Our guess Not sure yet · we’re testing this · one of the twelve that matter most
Three cities every two years on average: a pace a co-operative can staff, which keeps opening cities for most of the horizon.
Think it’s wrong? Tell us - When money is idle, grow up to this much faster2×
When the Fund’s own money — what buildings send on and what EHC earns above its reserve — is not needed by any building yet, it pays for extra buildings, breadth first: the next cities in the plan’s order open early (at most two openings a year, one extra building each), and what is left adds buildings in cities that are already open and have room (at most one extra a year in any city). All starts in a year stay within this many times the planned pace. 1 turns it off.
Our design choice Not sure yet
Our choice (2026-09-29): money the network earns goes into more homes, not into a bank account. Twice the planned pace is the most by default, because teams and partners limit how fast buildings can really start.
Think it’s wrong? Tell us - EHC’s share of the convertible buildings in a city5%
Of the empty buildings in a city that could become homes, the share EHC can realistically win on workable terms — against private converters, hotels and other bidders.
Our guess Not sure yet
About one in twenty. Dutch housing corporations own 7% of office conversions (CBS 2024); Paris’s social landlords did 42% of large ones, but with the city behind them; Dublin’s council assessed 500+ buildings and ended with one scheme. The number that decides how many buildings each city can take.
Think it’s wrong? Tell us - Empty offices that could become homes10%
The share of a city’s empty office floor in whole buildings that can be converted AND pay their way at a workable price — available when EHC arrives.
Market benchmark Somewhat sure
About 30% of empty office space is technically convertible (ifo/Colliers 2024 for Germany’s seven largest cities; Cushman & Wakefield NL 2022: 32%), but only a fraction sits in whole empty buildings (≈20% in Brussels) and pays its way at undistressed prices — about 10%.
ifo/Colliers 2024; Cushman & Wakefield NL 2022; perspective.brussels 2024, 2024
Think it’s wrong? Tell us - Offices converted to homes each year0.3% a year
The share of a city’s whole office stock that is converted into homes each year, by anyone — the new buildings that come up after EHC arrives.
Market benchmark Somewhat sure
Measured: about 0.15% a year in Paris (APUR 2023), about 0.6% in Brussels (perspective.brussels); the Netherlands converts some 2,800 buildings a year (CBS 2025).
APUR 2023; perspective.brussels 2024; CBS 2025, 2023
Think it’s wrong? Tell us - Other empty buildings: schools, churches, public buildings, malls40%
Once the network has the experience, other empty buildings add to what a city can supply each year — churches and their halls, schools, barracks and public offices, department stores, some hospitals and hotels — counted in buildings of our size and shown as a share of what its offices supply. More in the north-west of Europe, where churches close fastest; less in Central and Eastern Europe.
Our guess Not sure yet
About 40% (a range of 12% to 100%). Where homes are made from old buildings, other buildings give 0.5× (England, 2024-25) to 1.4–1.9× (the Netherlands, 2023–24) the homes offices do, but mostly in small buildings; at our size churches, schools, state property and department stores add about a third to a half. Surplus is well documented — a quarter of Dutch churches already have a new use, German churches plan to sell some 40,000 properties by 2060, Italy has closed 2,600 schools in a decade, and state owners (BImA, the UK and French state) sell at a discount for homes — but only 8 of 56 closed German department stores became homes.
Think it’s wrong? Tell us - Other empty buildings: from year8 years
The year of the network’s life from which it also takes on other empty buildings.
Our design choice Not sure yet
Eight years: public buildings and hotels can come earlier, churches and schools later — harder conversions, best taken on once the first buildings are running.
Think it’s wrong? Tell us - Other empty buildings: in full from year20 years
The year by which other empty buildings add their full share; they phase in evenly until then.
Our design choice Not sure yet
Twenty years: a gradual ramp as the network learns each kind of building, while the surplus of churches, schools and hospitals keeps growing through the 2030s–2050s.
Think it’s wrong? Tell us - At least this many buildings in any city opened2
However few empty buildings a city offers, the network can take at least this many in total there. With the supply limit on, it is the floor under every small city: raise it and all the smaller cities add buildings at once.
Our design choice Not sure yet
Two by default: opening a city for a single building rarely pays for the local work. It is more powerful than it looks, because it applies to every small city the network opens and so lifts the size of the network in the later years.
Think it’s wrong? Tell us - Limit each city to the buildings it can really sourceOn
On: each city’s buildings follow its supply of convertible empty buildings. Off: a ceiling by population alone (the old rule).
Our design choice Somewhat sure
Our choice (2026-09-29): a plan should not count buildings nobody would offer.
Think it’s wrong? Tell us - The Fund’s own buffer, in years of building3 years
How much of its own money the Fund keeps in hand, counted in years of what new buildings need. Above it, money goes first into more buildings and then back to members as lower prices.
Our design choice Not sure yet
Our choice (2026-09-29): three years, so growth never has to wait on outside investors again once the network pays for itself — and no more, so money is not simply kept.
Think it’s wrong? Tell us - Open more cities than the plan when money allowsOn
The cities where a building adds up but the plan does not reach wait in reserve; when the Fund’s own money is idle, it opens them, in the plan’s order.
Our design choice Not sure yet
Our choice (2026-09-29): growth comes before handing money back — but only in cities where the numbers work. In our version it changes nothing: the plan already reaches every city where a building adds up, so no city waits in reserve. It would matter with a lower ceiling on the number of cities.
Think it’s wrong? Tell us - Hand idle money back as lower pricesOn
What is still idle above the buffer, after the extra buildings, is not collected the next year: lower dues for every member, cheaper furnished flats for members on the move, and a smaller solidarity part for the households — each in proportion to what they paid in.
Our design choice Not sure yet
Our choice (2026-09-29): a co-op should not keep what it does not need. It is a refund of use, never a dividend; EHC hands back only its own surplus, never below its costs.
Think it’s wrong? Tell us - Most cities the network reaches100
The ceiling on how many cities the network opens in.
Our design choice Somewhat sure
A ceiling of roughly three or four cities in each of about thirty focus countries.
Think it’s wrong? Tell us - Most cities in one country5
The most cities any one country opens, its best-suited first, so no country dominates.
Our design choice Somewhat sure
A few per country, close to the pilot shortlist, so the network stays pan-European rather than national.
Think it’s wrong? Tell us - New buildings per city each year0.5
How many buildings a city starts each year in the early years, before it tapers toward its ceiling. With the supply limit on, a city can only start what it can really source, so this sets how fast cities reach their supply, not how many buildings there are at the end.
Our guess Not sure yet
Half a building a year: one co-op with one local partner manages about 0.3–0.5 a year in the cases we know (wagnis in Munich, Kalkbreite in Zürich, the City of Paris’s own landlord at ~0.7), and a first building takes 5–8 years after entering a city. Because each city is also limited by the buildings it can really source (‘EHC’s share of the convertible buildings in a city’), moving this barely changes the network in year 60; it changes how soon it gets there.
Think it’s wrong? Tell us - Most buildings in one city20
The most buildings the network puts in one city of two million people or more; smaller cities get a share of it by population. It matters only when the limit by what a city can really source is switched off.
Our guess Not sure yet
Used only when limiting each city to the buildings it can really source (‘Limit each city to the buildings it can really source’) is off, or for a city with no supply estimate; while the limit is on, each city takes what it can really source and this number does nothing.
Think it’s wrong? Tell us - Years from finding a building to opening it5 years
How long, in the network view, it takes from finding a building to its first residents moving in.
Our guess Not sure yet
Longer than the works alone, because finding, negotiating and financing a building comes first.
Think it’s wrong? Tell us - Share of easy conversions50%
Of the buildings converted across the network, the share that are easy (shallow floors, sound façade) and so cheaper.
Our guess Not sure yet
Half easy, a fifth hard lands the blend on each country’s own conversion factor.
Think it’s wrong? Tell us - Share of hard conversions20%
The share that are hard (deep floor plans, new façade and services) and cost about as much as building new.
Our guess Not sure yet
A fifth hard; together with half easy it lands the blend on each country’s own conversion factor.
Think it’s wrong? Tell us - Empty office space in the cityper city
How much office floor stands empty in the city — it sets how many buildings the city could eventually host.
Sourced data Somewhat sure
Curated city data: vacant office stock, shown with its source on each city
Think it’s wrong? Tell us
Who joins
- People in the city for a few monthsper city
How many people live in the city on stays of three to twelve months — a sign of demand for the furnished flats when choosing where to start.
Sourced data Not sure yet
Curated city data: mid-term residents, shown with its source on each city
Think it’s wrong? Tell us - Founding members1,000 people
How many people join before the first building to found the co-operative across Europe.
Our design choice Not sure yet · we’re testing this
The plan’s target for the appetite test: 1,000 founding individuals.
Think it’s wrong? Tell us - Supporting members per home4.5 people
How many people who do not live in a building join through it for each home — the waiting list, future residents and exchange users.
Our guess Not sure yet
A guess: a well-liked building’s waiting list, future residents and exchange users can easily outnumber the people who live in it.
Think it’s wrong? Tell us - Founding member companies50
How many companies join before the first building — from anywhere in Europe, not only the first cities — and stay as a floor, leavers replaced.
Our design choice Not sure yet · we’re testing this
Our choice (2026-09-29): 50 companies paying before the first building — the appetite test aims for more, but the closest comparable network (Job & Wohnen Berlin) started with 8. Change it here.
Think it’s wrong? Tell us - Member companies per city15
How many member companies the network can expect in each city it is active in.
Our guess Not sure yet · we’re testing this
A placeholder until partners give real numbers: companies follow the network’s footprint rather than growing on their own.
Think it’s wrong? Tell us - Member companies per building3
How many more member companies each open building draws in — suppliers, managers, employers housing staff there.
Our guess Not sure yet
Suppliers, managers and employers housing staff in the building are the ones it draws in; a placeholder until our first buildings show who actually joins.
Think it’s wrong? Tell us - How fast companies join35% a year
The share of the gap to the expected number of companies that closes each year.
Our guess Not sure yet
Companies decide over a budget cycle or two, not overnight, so only part of the gap closes each year; a placeholder until our own members tell us.
Think it’s wrong? Tell us - Companies leaving each year12% a year
The share of member companies that leave in a year.
Our guess Not sure yet
Set a little below the 16–18% a year that membership bodies typically lose (they keep 82–84% of members: MGI 2025/26; i4a), on the bet that a company housing staff through the network has more reason to stay. A placeholder until our own members tell us.
Think it’s wrong? Tell us - Most member companies4,000
The ceiling on member companies across the whole network.
Our guess Not sure yet
A ceiling so the company base cannot outrun the network; a placeholder (decided 2026-09-28).
Think it’s wrong? Tell us - Furnished flats kept for company staff0%
The share of the furnished flats set aside for staff sent by member companies; any unused go back to all members.
Our design choice Not sure yet
Off in our version: every furnished flat stays open to all members. Raise it to set a share aside for staff sent by member companies, so the promise of housing for company staff means something while most flats stay open to all.
Think it’s wrong? Tell us - Building spend companies can bid for60%
The share of what a building spends on works and running that member companies could bid to supply.
Our guess Not sure yet
Most of what a building spends on works and running — repairs, cleaning, energy, fit-out — is bought locally and could be supplied by member companies; the share that is realistically theirs is a placeholder until they bid.
Think it’s wrong? Tell us
Model internals
- Faster building once mature1.3×
How many times faster a city starts buildings once the organisation is experienced (1 = no faster).
Our guess Not sure yet
Our version lets an experienced organisation start somewhat more buildings per city, ramping up over the years on the next card; set it to 1 to not count on getting faster.
Think it’s wrong? Tell us - Years to reach that pace20 years
How many years it takes to go from the early pace to the mature one.
Our guess Not sure yet
Twenty years for an organisation to reach its full pace; only matters when the faster-pace card is above 1.
Think it’s wrong? Tell us - Long-term homes that come free each year8% a year
The share of long-term homes whose residents move on in a year, freeing them for other members.
Our guess Not sure yet
A member moves on about every twelve years.
Think it’s wrong? Tell us - Nights residents lend their home20 nights
How many nights a year a resident offers their home to other members while away.
Our guess Not sure yet
A few weekends and a holiday a year, times the share of residents who offer; a guess.
Think it’s wrong? Tell us - Length of a short swap stay4 nights
How long a short stay in another member’s home lasts.
Our guess Not sure yet
A long weekend.
Think it’s wrong? Tell us - Members looking for a home this year25%
The share of members actively looking for a place to live in a given year — many join for the network and the values.
Our guess Not sure yet
Many join for the network and the values, so only a quarter look for a home in any year; a guess.
Think it’s wrong? Tell us - Warn when free homes serve less than this share of the members looking for one0.5
The model warns when the homes that come free serve fewer than this share of the members looking for one (0.5 = half of them; 1 = all of them).
Our design choice Somewhat sure
Below half, the promise of access starts to ring hollow.
Think it’s wrong? Tell us - Staff each company brings in0 people
How many of a member company’s staff join as individual members themselves.
Our guess Not sure yet
Off in our version: we do not count the staff of member companies as individual members until companies tell us how many would join. Raise it to add members (with their dues and shares) through companies.
Think it’s wrong? Tell us - Founding team3 FTE
How many full-time people run the organisation in its first year.
Our design choice Somewhat sure
Three founders full-time in year one — the team we can realistically fund from founding members.
Think it’s wrong? Tell us - Fastest the team can grow30% a year
The most the team can grow in a year — hiring and settling people in takes time.
Our guess Not sure yet
Hiring and settling people takes time, so the team cannot double overnight; a placeholder for a real hiring plan.
Think it’s wrong? Tell us - Length of the founding years8 years
How many years the founders’ way of working (more field work, less head office) takes to fade out.
Our guess Not sure yet
About eight years, until the first cities and buildings are established.
Think it’s wrong? Tell us - Share of the central team not yet hired in year one60%
How much of the central head-office team does not exist yet at launch and is built up over the founding years.
Our guess Not sure yet
A founding team cannot staff a full head office on day one; 60% held back is our judgement.
Think it’s wrong? Tell us - Founders’ field work in year one4 FTE
How much of the founders’ time goes on opening cities and finding buildings in the first year.
Our guess Not sure yet
The founders do the first city-opening and building work themselves; our judgement.
Think it’s wrong? Tell us - Central core team6 FTE
The leadership and central team that exists whatever the network’s size — finance, legal, partnerships, communications, operations.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Staff per country0.5 FTE
Regional coordination, local law and partnerships, per country the network is active in.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Standing staff per city0.3 FTE
The ongoing presence in each city — supporting local members, the council relationship and the pipeline of buildings.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Effort to open a new city1 FTE
Full-time years of work to open a new city — finding offices, the local co-op, the council and investors.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Staff per building being developed0.2 FTE
Central work to find and structure each building while it is being developed.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Staff per open building0.05 FTE
Central oversight of each building once it is open (0.05 = one person for 20 buildings); the building manager does the day-to-day work.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Members per member-support person2,500 people
How many members one member-support person looks after — higher means more self-service.
Our guess Not sure yet
A digital-first co-operative automates much of member support; a guess.
Think it’s wrong? Tell us - Members per marketing person6,000 people
How many members there are for each person working on marketing and growth.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Finance and legal staff per country0.5 FTE
Finance, legal and compliance work per country — each country needs its own regulated entity.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Fundraising team1.5 FTE
The team that raises and looks after the Fund’s money from investors.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Fundraising staff per open building0.006 FTE
Extra fundraising and investor-relations work for each open building (for example, 0.006 is one person for about 170 buildings).
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Democratic governance staff per country0.3 FTE
Staff who organise members’ assemblies, councils and elections in each country; the taking part itself is voluntary.
Our guess Not sure yet
Lean, because members run their own assemblies; a guess.
Think it’s wrong? Tell us - Advocacy and research team at full size9 FTE
The team that argues for better housing policy and shares what the network learns, once the network is fully grown.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - Impact measurement per building0.012 FTE
Work measuring and reporting each building’s social and environmental impact.
Our guess Not sure yet
A bottom-up staffing guess: with the other staffing cards, the team grows with the network to about eighty people by year 60. To be replaced by a real organisation plan.
Think it’s wrong? Tell us - How much more a mature team gets done1.5×
How many times more work per person the central team does once the network is large, from doing the same work many times: templates, repeat deals, known partners. Automation is a separate card.
Our guess Not sure yet
Learning from repeat work should cut the effort per building by a third at 500 open buildings; untested. Until 2026-09-30 this card also carried automation (at 2×); that is now ‘Pace of automation’.
Think it’s wrong? Tell us - Technology team1 FTE
The engineers who build and run the digital platform, whatever the network’s size.
Our guess Not sure yet
A small core engineering team; a guess until the platform is specified.
Think it’s wrong? Tell us - Technology staff per open building0.025 FTE
Extra engineering for each open building the platform serves (for example, 0.02 is one engineer per 50 buildings).
Our guess Not sure yet
One engineer per few dozen open buildings; a guess.
Think it’s wrong? Tell us - People and management staff per 100 staff4 FTE
HR, recruiting, internal IT and the layer of managers a team needs as it grows, per 100 other staff.
Market benchmark Somewhat sure
Typical HR-to-staff ratios of 1–2 per 100 in mid-sized organisations, plus internal IT and management
Think it’s wrong? Tell us - Extra team to build the platform in the founding years2 FTE
Engineers who build the digital platform before the first buildings open. The extra team shrinks to nothing over the founding years, as the buildings it serves open.
Our guess Not sure yet
The booking, membership and exchange platform has to exist before there is anything to book; our guess until the platform is specified.
Think it’s wrong? Tell us